Okada Business Admin Team

Home Page / TOC & PC Dashboard

# CP no Title Contractor Completion Date Status
1 CP-04 Design and Construction of Sea Wall (including Outfall) Sta. Elena 22 Jun 2015 TOC Signed
2 CP-05 Phase 1A, Foundations & Phase 1 Site Establishment - Group A HILMARC's Construction Corp. 30-Apr-14 TOC Signed
3 CP-05 Phase 1A, Foundations & Phase 1 Site Establishment - Group B DDTKI 30-Oct-13 Signed Performance Certificate
4 CP-05 Phase 2, Substructure - Group A HILMARC's Construction Corp. 28-Feb-15 Signed Uploaded in Aconex AMCON-TRANSMIT-009757
5 CP-05A Phase 2, Substructure - Group B (CenGen Structural) Metro Stonerich Corporation 23-Aug-16 Signed TOC & Performance Certificate Uploaded in Aconex AMCON-TRANSMIT-009761 Copy transmitted to QSI 01.26.18
6 CP-05B Phase 2, Substructure - Group B (CenGen Architectural) Metro Stonerich Corporation 7-Jul-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009762
7 CP-06 Phase 3A Podium and Tower Superstructure w/ BWIC - Group A HILMARC's Construction Corp. 31-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-00 Copy transmitted to QSI 07.23.18
8 CP-06A Proportion of remaining Structural Works Podium Group B (completion of DDTKI works) HILMARC's Construction Corp. 31-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-011034 Copy transmitted to QSI 07.23.18
9 CP-06B Proportion of remaining Structural Works Podium Group B (completion of DDTKI works) FINMAT International Resources, Inc. 26-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009764
10 CP-08A.1 Supply & Delivery of Transformer ELECSYS 3-Oct-16 Signed Uploaded in Aconex AMCON-TRANSMIT-011862
11 CP-08a.2 Supply & Delivery of Various Panels and Switchgears ENERCON 26-Apr-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009497
12 CP-08a.3 Supply & Delivery of Generator CUMMINS 18-Aug-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009584
13 CP-08a.4 Supply & Delivery of Various Acoustic Silencers and Doors ACOTECH 17-May-16 Signed Uploaded in Aconex AMCON-TRANSMIT-008813
14 CP-10 STP System and Installation (Direct) Ecosystem 27-Mar-17 TOC Signed
15 ME.14 Supply & Delivery of Air Handling Units and Primary Air Handling Units UNITED OFFICE SYSTEM Pvt. Ltc. Signed Uploaded in Aconex AMCON-TRANSMIT-009984
16 ME.15 Supply and Delivery of Fan Filter Units Aire Flow Technik Phils., Inc. 28-Dec-17 Signed Uploaded in Aconex AMCON-TRANSMIT-0111838 Copy transmitted to QSI 06-Feb-18
17 EE.01 Supply and Delivery of Transformer ABB 9-Aug-16 Uploaded in Aconex AMCON-TRANSMIT-012008
18 EE.05 Supply and Delivery UPS and Static Transfer Switch COMPUTER SUPPORT CENTER 19-May-17 Signed with Okada Letter: Demand to submit TOC requirements
19 EE.07 Supply & Delivery of General Lightings Stealth Ventures 1-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-013485
20 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - 407 Units of BF102 JDS Construction Philippines Inc. 2-Feb-17 Signed Uploaded in Aconex AMCON-TRANSMIT-012268
21 CP-07.4 & CP-09.4 Supply and Delivery of Sanitary Wares and Bathroom Accessories & BP-18 HAFELE Philippines, Inc. 12-Jul-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009583
22 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - Symmons American International Plumbing Supply As per contract no need for TOC
23 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - PYOS Soap Dispenser Mac Faucets, LLC As per contract no need for TOC
24 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - Nova Jacuzzi Pacific Building Materials As per contract no need for TOC
25 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - Shaving Mirror Harle Philippines 29-Mar-17 Signed Uploaded in Aconex AMCON-TRANSMIT-011837
26 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - Reginox Kitchen Sink Eurotiles Industrial Corporation As per contract no need for TOC
27 CP-07.4 & CP-09.4 Supply & Delivery of Sanitary Wares - Double Tissue Holder Guangzhou Neckong Metal Product Factory As per contract no need for TOC
28 CP13A Phase 3B, Architectural Tower - Group A Phenix Garuda 15-Sep-17 Signed Uploaded in Aconex AMCON-TRANSMIT-013527
29 CP13B Phase 3B, Architectural Tower - Group B EEBLACK 26-Jan-18 Signed Uploaded in Aconex AMCON-TRANSMIT-013481
30 CP14D Façade Podium - Group A & B Digee Glass 31-Mar-17 Signed Uploaded in Aconex AMCON-TRANSMIT-013477
31 CP-15A Façade Tower Group A & B (Supply) JANGHO 30-Sep-16 Signed Uploaded in Aconex AMCON-TRANSMIT-009766 Copy transmitted to QSI 01.26.18
32 CP-15D Façade Tower Group A & B (Site Fabrication & Installation) JANGHO 30-Mar-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010245 Copy transmitted to QSI 05.08.18
33 CP-16A Glass Dome and Corridor – Design Prime Structures Engineering Pte Ltd 23-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-012164
34 CP-16B Glass Dome and Corridor – Supply Prime Structures Engineering Pte Ltd 26-Sep-17 Uploaded in Aconex AMCON-TRANSMIT-008907
35 CP-16C Installation of Aluminum & Glazing System for Glass Dome and Corridor PSE-CST JV Corporation 23-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-011464
36 CP-16D Installation of Structural Steel for Glass Dome and Corridor TRANSASIA Construction Dev't Corp. 8-Jul-16 Signed Uploaded in Aconex AMCON-TRANSMIT-009767
37 CP-16D Supply & installation of Steel at Extension Canopy A & B, Decorative Canopy TRANSASIA Construction Dev't Corp. 5-Sep-17 Signed TOC & Performance Certificate Uploaded in Aconex AMCON-TRANSMIT-010103 Copy transmitted to QSI 05.02.18
38 CP-17 External Works and Infrastructure (Civil & MEP Works) HILMARC's Construction Corp. 30-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-0011465
39 CP-17A Airport Lounge - Terminal 1 & 3 HILMARC's Construction Corp. 31-May-17 Signed Uploaded in Aconex
40 CP-21.1A Supply and Delivery of Mosaic Tiles in Porte Cochere Ceiling ELLITE TILE CORPORATION 23-Oct-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009582
41 CP-21.13A ID Fit-out for UGF Grand Salon Ballroom Beijing Haiting Dayton Architectural Design Engineering Co., Ltd. 27-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-013478
42 CP-21.25 Robatayaki Restaurant + Italian Restaurant (Fit-out & MEP) Classique 16-Oct-17 (CP-21.25) 6-Nov-2017(CP-21.33) Signed Uploaded in Aconex AMCON-TRANSMIT-012265 & 012266
43 CP-22.1E VIP Tower - Group A (L9 & L12) Isofirm 11-May-18 Signed with Okada Letter: Demand to submit TOC requirements
44 CP-26A.2.1 Kitchen and Restaurant Equipments - Supply Technolux 20-Dec-16 Signed Uploaded in Aconex AMCON-TRANSMIT-013480
45 CP-27.1 & CP-27.2 Laundry Equipments - Supply, Management & Supervision TECHNOLUX Equipment & Supply Corp. 30-Mar-17 Signed Uploaded in Aconex AMCON-TRANSMIT-012165
46 CP-30A Swimming Pool Equipment - Supply Fluidra 7-May-18 For conforme by Contractor (with Okada Letter: Demand to submit TOC requirements) Signed by DCII, J.D, D.E
47 CP-31A GFRC - Supply Theme Builders Philippines Inc. 31-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-012267
48 CP-35 Casino Mock Up R.G Simbulan 19-Aug-16 Signed Uploaded in Aconex AMCON-TRANSMIT-011050
49 CP-36.1 Site Office Renovation DHN 26-Apr-15 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-009769Copy transmitted to QSI 01.26.18
50 CP-38A Building Maintenance Unit - Supply (Foreign) MHE DEMAG (P) INC. 17-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010647 Copy transmitted to QSI 06.21.18
51 CP-38B Project Management Administration, Testing and Commisioning MHE DEMAG (P) INC. 18-Jun-18 Signed Uploaded in Aconex AMCON-TRANSMIT-013479
52 CP-38D Building Maintenance Unit - Supply (Local) MHE DEMAG (P) INC. 17-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010648
53 CP-40A BMS (Bldg. Management System) - Supply (Foreign) Honeywell 12-Jun-18 Signed Uploaded in Aconex AMCON-TRANSMIT-013482
54 CP-42A Uniform Conveyor - Foreign Portion AUTOVALET SYSTEM MACAU LIMITADA 17-Feb-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010586
55 CP-47A Structural Steel Works (Allocated Portion) BS Tech 30-Jul-17 TOC Signed
56 CP-47B Structural Steel Works (Allocated Portion) HILMARC's Construction Corp. 31-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-012166
57 CP-50 Final Cleaning R.H Phil 16-Dec-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-010103 Copy transmitted to QSI 04.30.18
58 CP-50.1 Interior and Exterior Cleaning of Dome ROPE ACCESS SERVICES & CONSULTING, INC. 12-Dec-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-010631 Copy transmitted to QSI 06.11.18
59 CP-51.01G Additional Manpower for ELV Cabling Works Altheane Builders 28-Feb-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-010503 Copy transmitted to QSI 05.31.18
60 CP-51.05A Data Centers – Supply & Delivery IBM Philippines Inc. 31-Dec-16 Signed Uploaded in Aconex AMCON-TRANSMIT-013483
61 CP-51.05A.1 Data Centers – Design, Project Management and Testing IBM Philippines Inc. 31-Dec-16 Signed Uploaded in Aconex AMCON-TRANSMIT-013483
62 CP-51.10A TETRA - Supply MOTOROLA SOLUTIONS, Inc. 10-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-008811
63 CP-51.10B TETRA - Design & Build MOTOROLA SOLUTIONS, Inc. 10-Nov-17 Signed Uploaded in Aconex AMCON-TRANSMIT-008812
64 CP-51.12C AV - IPTV (Internet Protocol Television) Samsung Electronics Philippines Corporation 31-Mar-18 For conforme by Contractor (with Okada Letter: Demand to submit PTOC requirements) *Signed by DCII, Y.Y,D.E
65 CP-51.18 Projection Mapping Christie Digital As per settlement agreement no need for TOC
66 CP-51.18A Projection Mapping Christie Digital As per settlement agreement no need for TOC
67 CP-51.20 Integration of Certain Owner-Provided Audio and Video Equipment and associated specialist accessories for the Glass Corridor Project Amigo Entertainment 7-Dec-17 For conforme by Contractor(with Okada Letter: Demand to submit TOC requirements) Signed by DCII, J.D, D.E
68 CP-53.1A Wood Doors SUNDART INTERNATIONAL SUPPLY LIMITED 14-Nov-17 For conforme by Contractor (with Okada Letter: Demand to submit TOC requirements) *Signed by DCII, J.D, D.E
69 CP-53.2A Supply & Delivery of Metal Doors - Single Panel LEC Steel Mfg. Corporation 1-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-0
70 CP-53.3 OSM - Metal Doors (Double Doors) Main Hardware Int'l Pte. Ltd. 2-Feb-17 Signed Uploaded in Aconex AMCON-TRANSMIT-011902
71 CP-53.3A Supply & Delivery of Hardwares - Privacy Door Latch VINYL Const. Ent. Inc. 2-Jun-17 Signed Uploaded in Aconex AMCON-TRANSMIT-007091 Copy transmitted to QSI 01.26.18
72 CP-56 Supply & Delivery of Raised Flooring (OSM) UNITED OFFICE SYSTEM 23-Apr-16 Signed Uploaded in Aconex AMCON-TRANSMIT-009770 Copy transmitted to QSI 01.26.18
73 CP-56A Supply & Installation of Raised Floor System at 2F TG & EG Training Room Data Center Design Corp. 10-May-18 Signed Uploaded in Aconex AMCON-TRANSMIT-011896
74 CP-58A Pre-Fabricated Woodworks/Millworks SENYUAN FURNITURE GROUP 23-Jan-18 For conforme by Contractor(with Okada Letter: Demand to submit PTOC requirements)*Signed by DCII, Y.Y,D.E
75 CP-58C Supply of Fabric - Tower B (Importation) ELEGANT 29-Aug-16 Signed Uploaded in Aconex AMCON-TRANSMIT-012269
76 CP-59 Supply & Delivery of Glass Fiber Reinforced Gypsum (GFRG) LYCON Asia Building Material Co. Ltd. 14-Jun-17 Signed TOC & Performance Certificate Uploaded in Aconex AMCON-TRANSMIT-004054 & AMCON-TRANSMIT-011462 Copy transmitted to QSI 01.26.18
77 CP-60.5 All terain Crane Rental Ravago 28-May-18 For conforme by Contractor 29-Nov-18 Signed by DCII, J.D, D.E
78 CP-61.1A Supply & Delivery of Off-Site Laundry Equipment (Foreign Portion) TECHNOLUX Equipment & Supply Corp. 24-Apr-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-009780 Copy transmitted to QSI 01.22.18
79 CP-61.1B Supply & Delivery of Off-Site Laundry Equipment (Foreign Portion) JENSEN Asia Pte. Ltd. 24-Apr-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009779 Copy transmitted to QSI 01.26.18
80 CP-61.2 Offsite Laundry Facility (Batangas) - Project Management, Administration, Testing and Commissioning TECHNOLUX Equipment & Supply Corp. 24-Apr-17 Signed Uploaded in Aconex AMCON-TRANSMIT-011839
81 CP-61.3 Supply & Installation of Off-site Laundry Equipment FWRN Enterprise 21-Jan-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-010698 Note: As per agreed with AECOM COC would suffice attachment to refer to CP61.1A Copy transmitted to QSI 01.26.18
82 CP-64A General Construction Works for Off-site Laundry TRANSASIA Construction Dev't Corp. 24-Apr-17 Signed Uploaded in Aconex AMCON-TRANSMIT-009771 Copy transmitted to QSI 02.09.18
83 CP-64B Design & Build of Boiler Equipment Off Site Laundry MECHSYS 24-Apr-17 Signed Uploaded in Aconex AMCON-TRANSMIT-004521 Copy transmitted to QSI 01.26.18
84 CP-70 Supply & Delivery of Shower Enclosure HOCHENG 25-Oct-18 For conforme by Contractor (with Okada Letter: Demand to submit TOC requirements)*Signed by DCII, J.D, D.E
85 CP-71 Supply & Delivery of Dallmeier Cameras for CCTV Surveillance Subic Bay Consultancy and Allied Services Corp. 3-Jul-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010502
86 CP-72A Supply of Glass Sliding Doors IDIC 30-Nov-16 Signed Uploaded in Aconex AMCON-TRANSMIT-009772
87 CP-73 Supply of Flower Pattern DSA Company Limited 3-Jan-17 Signed Uploaded in Aconex AMCON-TRANSMIT-007090
88 CP-75 Supply & Installation of Artificial Canary Palm Tree Manapat Interior 15-Jun-18 Signed Uploaded in Aconex AMCON-TRANSMIT-013528
89 CP-83 Rodent Management Services JULANT Pest Control System, Inc. 30-Jun-18 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-011463
90 CP-87 ID Fit-Out and MEP Works for Kids Club Zone (Previously known as C-01A retail area) at Level UGF Isofirm 15-Feb-18 For conforme by Contractor 09-May-19 *Signed by DCII, CTA, Y.Y,D.E
91 CP102F ID Fit-out Woks - BOH Pampanga Block Builders 24-Oct-18 Signed Uploaded in Aconex AMCON-TRANSMIT-012866
92 CP-105 Supply & Delivery of Acoustic Ceiling Tiles Skydragon Construction Products, Inc. 27-Sep-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010472 Copy transmitted to QSI 05.17.18
93 CP-106 Supply & Installation of Carpet Tiles Design Ambience, Inc. 16-Apr-18 Signed Uploaded in Aconex AMCON-TRANSMIT-011842
94 CP-107 Supply & Installation of Wall Cover Wall Crown Design Center, Inc. 11-Sep-17 Signed Uploaded in Aconex AMCON-TRANSMIT-010812 Copy transmitted to QSI 07.02.18
95 CP-108 Supply & Delivery of Bell Chimes for Guestrooms Digital Network Communications and Computers 6-Dec-16 Routed to DIGICOM 04-Dec-18
96 CP-109 On-site Cleaning/Clearing Requirement Djarna Manpower Services 16-May-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-010104 Copy transmitted to QSI 04.30.18
97 CP-111 Janitorial Services Superior Maintenance Services, Inc 15-Dec-17 Signed Certificate of Completion Uploaded in Aconex AMCON-TRANSMIT-010105 Copy transmitted to QSI 04.12.18